Name of the project:

CDM Consultancy Services for 6 MW waste heat recovery based captive power project for sponge iron plant

Program Area:

Climate Change

Country:

India

Project Length:

January 2007-June 2007 

Sponsor:

Maa Chhina Mastika Steel & Power Ltd

Contact:

debajit@winrockindia.org

The project developer, Maa Chinnamastika Steel and Power Ltd. installed Waste Heat Recovery Boilers to extract heat from the Direct Reduced Iron (DRI) kilns used in Sponge Iron production. The recovered heat was used to produce steam and subsequently power for captive consumption. 
The main objectives of the Project:-

  • Preparation of Project Idea Note (PIN) and Project Concept Note (PCN)
  • Preparation of Project Design Document (PDD)
  • Assistance in validation, registration, verification and certification
  • Assistance in Sell of Emission Reductions Units (ERUs)

 